7. Administering NEC3 Contracts Online by James Still of BIW

11 August 2011
Share
Share this with
The NEC imposes high levels of administration and unless its carefully managed can lead to delays and costly losses. James Still of BIW Technologies demonstrate how they’ve helped clients such as Connect Plus M25 and Cambridgeshire Highways to overcome such issues, improve their methodology, make substantial savings and reduce risk. The delegates then split into three core groups for a brainstorm session on what aspects of planning, commercial or project management they would like to see enhanced as and when the contract is next amended. The groups then reported back what they have come up with. Speakers Website biw.co.uk Planning Projects under the NEC3 Form of Contract, 16 May 2011